Roof renewal under scaffold at a building-society branch in Llanelli, seen from above

KINGSLEY BUILD GROUP

Property Maintenance & Refurbishment

Reactive maintenance with a 24-hour service across Wales, the West and London, planned maintenance and refurbishments. Newport-based, working nationwide.

Branch roof works, Llanelli, for a facilities contractor.

MAINTENANCE & REFURBISHMENT

What we look after

Reactive maintenance

Repeat call-off programmes for two South Wales councils: 21 instructions in a year for one (fencing, plumbing, electrical, fire-stopping, flooring, cleaning) and 19 for the other (allotments, parks and depot works).

  • 24-hour service
  • Reactive cover across Wales, the West and London
  • Emergency: response within 4 hours
  • Urgent: same-day response
  • Routine: within 48 hours, for non-specialist material orders

Response times are our service targets.

Kingsley operative at a secured doorway on a reactive maintenance call-out
Kingsley team surveying a stripped plant room before refurbishment

Planned maintenance

Regular inspections and maintenance plans.

A rolling call-off programme for a healthcare provider across South Wales sites, 2025–26: redecoration, flooring, a roof-leak investigation and plant removal.

Refurbishments

From bin and bike storage to conversions, refurbishments and extensions.

All trades are in house except mechanical and electrical (M&E).

Our in-house technical design team provides architectural, structural, mechanical and electrical support.

Recent: a changing-room refurbishment at a national sports centre in Cardiff, a head-office refurbishment for a pest-control company, and a detached classroom for a Cardiff primary school.

Five Kingsley operatives in a stripped-out room, drawings on the wall, ahead of a refit
Kingsley operative on a boom lift clearing ivy from a boundary wall

Grounds maintenance

  • Lawn management
  • Year-round care: autumn clean-up to winter snow removal
  • Sports-field maintenance: mowing, line striping, turf repair
PROJECTS

Recent work

Oak-slat feature wall in a refurbished office

Ecolab head office refurbishment

Full refurbishment of the Ecolab head office, March to October 2025.

Kingsley operatives installing safety fencing at height on a Cardiff rooftop

Safety fencing, St David's, Cardiff

Safety and fall-prevention fencing at St David’s, Cardiff: installed at high level without compromising access or appearance. Around 120 m of 2.2 m V-mesh on bolt-down posts to the upper car-park levels, for a main contractor, summer 2025.

Newport Transporter Bridge, site photograph supplied by Kingsley

Newport Transporter Bridge

Works at Newport Transporter Bridge during its renovation, as a main contractor’s subcontractor.

Kingsley operatives outside a Nationwide branch during stone repairs

Nationwide, Devizes

Bath-stone repair to the front elevation of a Nationwide branch in Devizes, February to March 2025, as a facilities contractor’s subcontractor. Grade II listed.

Kingsley team outside a scaffolded Nationwide branch in Llanelli

Nationwide branches, South Wales and the South West

A repeat branch-repair programme for a facilities contractor since 2025: roofing, downpipes, bird netting, stonework, window replacement, and roof and interior condition surveys. Llanelli branch: roof, window and downpipe renewal, May 2025 to January 2026.

Green steel-clad garage bays with roller-shutter doors at a council depot

Telford Street Depot, Newport

A steel-frame machinery garage for Newport City Council at its Telford Street depot: piled pad foundations, steel frame, plastisol-coated cladding and three industrial roller shutters, on site from March 2026.

Finished classroom interior with laminate floor and suspended ceiling

Detached classroom, South Wales

A detached classroom for a Cardiff primary school, designed and built as a main contractor’s subcontractor: Key Stage 2 WCs, kitchenette and electrics, built over the six-week summer holidays.

More maintenance work

  • Sport Wales

    Changing-room refurbishment and reconfiguration at the Sport Wales National Centre, Sophia Gardens, Cardiff, under a JCT Minor Works contract, on site from March 2026; earlier, V-mesh boundary fencing renewal at Sophia Gardens (2024).

  • The Aldgate School, London

    Pest-proofing fencing works at a City of London primary school, August 2026, as a pest-control company’s subcontractor.

  • Prison and secure-estate works

    Call-off packages at a prison in the South West under a national facilities provider’s framework (2026): general building, core-hole infill, temporary propping and ceiling works.

All projects
UPKEEP

Property maintenance

Landscaping and lawn care, cleaning of common areas.

Repair partner to a building-maintenance contractor since 2023: 46 instructions in eighteen months across render repairs, plastering, flooring, paving, plumbing and refurbishment.

Property maintenance
COVERAGE

Maintenance coverage area

Newport-based, working nationwide: call-off work across England, from Bristol and London to Birmingham, Manchester and Lincoln, plus the South West and Ireland. Reactive cover for Wales, the West and London is a 24-hour service.

Constructionline GoldCHASSSIP via Once For All

Ready to work together?

Constructionline Gold and CHAS accredited. Newport-based, with call-off work across England, the South West and Ireland.